| Project | Clapham Wind Tunnel, Bedford |
| Client | Formula One Jaguar |
| Main Contractor | SDC Ltd |
| Duration | 16 Weeks |
| Value | £500,00 |
A wind test tunnel constructed in the late 40's - early 50's. The unit was a top secret MOD research facility until bought for use in Formula 1 Racing Car design. The project was carried out by Gunite (Eastern) Ltd under the surveillance of the BBA in accordance with the Sika Icoment BBA Certificate.
Scope of Works:
-
Hydrodemolition to remove defective concrete
-
Concrete repair and levelling to all external concrete surfaces
-
Elastomeric Coatings to all vertical and inclined surfaces
-
Waterproof anti-slip epoxy coatings to roof surfaces
-
Combiflex jointing systems
-
Steelwork preparation by ultra high-pressure water followed by epoxy coating