
Projects
Kensington Hilton Hotel, London
PROJECT HIGHLIGHTS
Situated within the affluent Holland Park district of Kensington, London and a short walk from the Westfield London shopping centre, the seven-storey, brick-clad Hilton London Kensington has two full height stairwells, one each located at either end of the building. Each stairwell was clad with brown tiles that required complete removal as part of the project to change their exterior appearance to give a more contemporary look.
PROBLEM AND SOLUTION
Our site team commenced this project by removing all existing tiles to the full height exterior of each stairwell followed by a comprehensive visual concrete survey to log all required repairs.
Further to client approval to proceed with the required concrete repairs (completed using Sika’s Monotop®-615 repair mortar), the newly exposed reinforced concrete walls had to undergo a significant volume of dubbing out to provide suitably flat vertical services of each stairwell prior to the final application of a new through-coloured render system.
OUTCOME
The client required a fresh new look for the stairwells at either end of the building to reflect the neighbouring building environment and provide a more contemporary style. Sika’s Parex render system applied with an embedded mesh was applied to both stairwells – a combined surface area of 230m2. The works were completed on time and within budget and provide a much cleaner & contemporary look to the building.













