Gunite
01480 466880
caroline.walters@gunite.co.uk
Fire Protection of Jepson House, Fulham by Gunfire

Fire Protection of Jepson House, Fulham

Gunfire was instructed by main contractor Breyer to install fire protection and stopping solutions providing 2 hours of fire integrity.  This was to be  across  compartment walls, to prevent the passage of fire from access risers into dwellings, at Jepson House in Fulham, London.

Fire protection works included:

  • Installing intumescent fire rated batt mastic through walls
  • Fitting intumescent fire wraps
  • Installing fire rated structural compound
  • Installation of a FD60 fire door and bespoke ceiling hatch to provide 60 minutes worth of fire protection

Works were carried out over a three month period in 2013 with residents in occupation.  They were carried out in accordance with our 3rd party accreditation with the LPCB (Loss Prevention Certification Board) 1531.

Client Breyer Group
Value £40K
Duration 6 Weeks
Sector Social Housing
Accreditations 2018