increased fire rating for commercial build Archway House data centre

Increased Fire Rating for Commercial Build at Archway House

Fire stopping works are now complete at Archway House, increasing the fire rating to 90 minutes.

Archway House is located in the heart of London Docklands and has undergone a refurbishment involving the design and construction of a new data centre within the existing office building.

Buxton Building Contractors Ltd asked us for a fire protection package to increase the fire rating to 90 minutes.

Scope of Works and fire protection materials used at Archway House

  • Vermiculite Spray to 109nr columns (increasing the fire rating to achieve 90 minutes)
  • 20mm of Nestaan Thermica SLV
  • Columns in the basement were beaded, for both fire protection and aesthetic reasons

before and after fire protection to columns in basement of Archway House

Fire protection works are carried out under our LPCB (Loss Prevention Certification Board) accreditation.

All works carried out by Gunfire comply with specified fire strategy and Part B building regulations, and our clients have real-time access to  cost and productivity information that includes logs, photos and more.

If you’re thinking about the fire stopping requirements for your next project, why not get in touch for a quote.

While you’re here why not also take a look at more case studies to see examples of passive fire protection, FRA services, and the external refurbishment, concrete repair, and waterproofing projects worked on by our sister company Gunite (Eastern) Ltd.

Client Buxton Building Contractors Ltd
Value £40K
Duration 2 Months
Sector Commercial Build
Accreditations 2018