Cripps Building


Projects

University of Cambridge

PROJECT HIGHLIGHTS

The award-winning Cripps Building at St John’s College, Cambridge was built in 1966 to meet a post-war expansion in student numbers. Designed by renowned architectural practice Powell & Moya, it has two courts and being Grade-II listed, has become a famous example of later 20th century architectural style. Today it houses more than 200 students.


PROBLEM AND SOLUTION


Gunite’s External Refurbishment division has carried out three separate phases of external façade remedial works since 2008. The 1st phase was to carry out a series of trial patch repairs that would blend in with the existing exposed reinforced concrete fabric of the building.

Over the three phases of works, we have cleaned the exposed concrete surfaces using the high temperature DOFF cleaning method.


OUTCOME


A series of concrete repairs had to be carried out with the finishes being blended in with the surrounding substrate. Works also carried out involved structural strengthening with carbon fibre (CFRPB) plates, sealant mastic replacement, protective coatings and corrosion protection.


Third-Party Accreditations

Whether repairing an existing distressed structure or delivering remedial works on a poorly constructed new one, finding a trusted partner with the right accreditations who will deliver to the correct design and specification is essential. At Gunite External Refurbishment, our clients benefit from more than 35 years of knowledge and experience in delivering innovative, tailored and cost-effective structural repair solutions, backed by a comprehensive range of industry accreditations that ensure full compliance with current standards and requirements.