St Michael’s C of E School


Projects

St Michael’s C of E School, Birmingham

PROJECT HIGHLIGHTS

The origin of St Michael’s Church of England Primary School & Nursery dates back as far as 1840, starting life as a ‘Sunday School’. The original school was closed in the mid-1950’s to be replaced by the current building which comprises a steel-framed single & two-storey block clad externally with reinforced concrete panels. The purpose of the contract was to improve the thermal performance of the building in line with current building regulations.


PROBLEM AND SOLUTION

In the role of Principal Contractor, we were tasked with carrying out initial concrete repairs to the damaged RC panels prior to being overclad with a new Permarock external wall insulated cladding system.

Additionally, our scope included the installation of a new fire escape staircase at one end of the building.


OUTCOME


Applied to c. 300m2 overall, Permarock’s 120mm thick mineral fibre insulation was adhered and mechanically fixed followed by the application of the PermaRock bedding mortar & reinforcement layer to a thickness of 5mm. Once cured, the base layer was then primed in readiness for the final coat application of PermaRock K-Finish Silicone Ultra @ 1.5mm thickness.


Third-Party Accreditations

When improving the energy efficiency of buildings, finding a trusted partner with the right accreditations who will deliver to the correct design and specification is essential. At Gunite Retrofit, our clients benefit from more than 35 years of knowledge and experience drawn from across our business in delivering innovative, tailored and cost-effective energy efficiency measures. Backed by a comprehensive range of industry accreditations, we ensure full compliance with current standards and requirements.